Skip to main content

Kings Park Project

Our Kings Park Project consisted of a complete deconstruction and removal of the existing decking, with a full replacement and additional pergola.

The decking used is 138 x 19 Spotted Gum hardwood, finished all round with a single herringbone boarder which follows through down the staircase, finished with Cutek Extreme decking oil.

The Balustrade is constructed out of Premium Primed Pine, using 88 x 88 posts and a 140 x 42 top rail along with stainless steel horizontal balustrade wire, painted in monument.

Finished off with a flyover style Lysaught Flatdek pergola,

Kings Park Project